TODAY’s PLANNED 9

TODAY’s DONE

  • modularization manual acceptance UI plus fixing button actions plus add test coverage 4 => 4
  • modularization move models to models and controllers to controllers plus renaming 2 => 2

TODAY’s NOT DONE

  • Charts

STANDUP

  • I was able to close with the main refactoring operations like extracting controllers and fix the test suite
  • I started manual acceptance of the new GUI and there are button actions to fix
  • Today: keep going with the manual acceptance until everything works and create test to cover the fix, commit a working app.
  • Final refactoring: rename countdown field, move pomodoro to models, delete useless old wrapper UI classes and commit again
  • Everything should be ready for the next session to start working again on charts.
  • Be careful with breaks and longer breaks

POMOSPECTIVE

  • Had session abort 2 hours before expected. Nothing I can do about it right now.
  • I was good with estimates to close the refactoring
  • I was strict with 5 mins break: did nothing.

INTERNAL INTERRUPTIONS

EXTERNAL INTERRUPTIONS

  • Several quick IM message exchange
  • Abort session

RAW DUMP


  103
  |@modularization fixed void click with a sender argument, now fixing submit click and writing tests
  |2009-03-24 08:03:15 -0500
  104
  |@modularization realized I was not saving the pomo on submit fixed
  |2009-03-24 08:35:10 -0500
  105
  |@modularization cosmetic changes to summary position plus tried borderless
  |2009-03-24 09:06:44 -0500
  106
  |@modularization committed, plus some other small fixes like removing the application class that was almost useless
  |2009-03-24 09:38:46 -0500
  107
  |@modularization renamed and moved the countdown field into timer controller
  |2009-03-24 11:20:35:43 -0500
  108
  |@modularization moved controllers and models to specific folders, fixed slow tests by mocking main view
  |2009-03-24 11:58:18:26 -0500